Complete football pitch renewal

Samara Arena / 2022

OSAN / Design study

The work in focus

Complete football pitch renewal

A football pitch is experienced at the surface but depends on the work beneath it. Renewal therefore connects the playing area with its underlying infrastructure. At Samara Arena, both parts belong to the complete pitch-renewal assignment described below.

In 2022, OSAN undertook the complete renewal of Samara Arena’s football pitch and its underlying infrastructure. The OSAN budget for the renewal scope is USD 41 million.

Explore the project
OSAN / 02.28OSAN / Design study
AB

ENGINEERING IN FOCUS

The pitch, from below.

Playing geometry

The pitch is read as one continuous playing area. Its perimeter, levels and relationship with surrounding stadium space establish the geometric context for renewal. The surface and its edges belong to the same spatial task.

Samara Arena

Our scope

01Complete football pitch renewal02Underlying pitch infrastructureRelated expertise